| Sector | abcWater Storage and Supply | Tender Value | INR 251.75 Crore | Location | Maharashtra - India | Ref.No | 23742622 | Closing Date | 28 - Sep - 2017 | | | Engineering, Procurement & Construction Contract for Execution of Arvi Lift Irrigation Scheme Under Lower wardha Project Comprising Lifting of 0.41 Ips/ Hectare water From Existing Lower Wardha Project reservoir for irrigation in 8400 Hectare Culturable Command area up to an individual Farmer area with residual head of 20 meters for Micro- Irrigation. This Includes work of All type of Survey, Planning of Entire System, Design, Drawing, Vetting From Concerned Authorities, Estimation, & Preparation & obtaining all Statutory Clearance. Construction of Approach Channel, Pump House & Its Components, Control Rooms, Internal Road in Pump house area. Compound wall with gate, Underground Pressurized Pipe network up to an Individual Farmer area sub Chak including Manifolds, Primary & Secondary Filtration units, Suitable anti Surge Devices, All inline Structures like thrust/ Anchor Blocks & Encasings, railways, highway & Pipe line Crossings, All type of Valves, Water Measuring Devices & All Accessories. Supply, Installation, Testing & Commissioning of Electric HT/ LT Lines from MSETCL/ MSEDCL Arvi Substation to pumping Station. Supply & Installation of 33 kv Substation & switch yard etc. at Pump house Location with All Accessories & Getting all Clearances from Statutory Authorities. Supply, Installation, Commissioning & Testing of Suitable Pumps & Motors with All related Electrical & mechanical Components of Pumps, Construction of Pump house & Accessories. Supply, Installation, Testing & Commissioning of SCADA Automation System to Control Entire System including Pump House & Wireless Field Control Units. Supply, Installation, Testing & Commissioning of Drip Irrigation system & Sprinklers to Farmers including main, Sub Mains, Emitter pipes, Sprinkler Sets & All its Accessories & Fittings As per PMKSY Guidelines. Construction of Farmers training Center at Arvi & Other Buildings As per relevant Standards & Specification of Required. Formation of Water User association As per MMISF act 2005. To Conduct Farmer Awareness training Program For Effective Functioning of the Scheme. All other Miscellaneous works required for Commissioning of Entire Scheme As Directed bu Engineer-in-charge During Execution. Power Consumption (Including All types of Power) in the Whole System Should not Exceed 4.2 Mw in 15 years lifetime. Commissioning & Testing of Entire System after Execution Operation & Maintenance of Complete Commissioned System for 5 years After Completion of Project. |
|
|
If you are a new user, then please
register, it's Free and then fill the form below.
If you are registered with us, just fill the form below, we will get back to you
shortly.
|
All fileds marked with '*' are compulsary.
|
|
|